Army Corps Docks on Lake Texoma and the Permit Moratorium: What Happened and What's Current

Brian & JonelleBrian & Jonelle
Sep 28, 2026 • 6 min read
Share to X
Share to Facebook
Share to Linkedin
Copy Link
Army Corps Docks on Lake Texoma and the Permit Moratorium: What Happened and What's Current
Chapters

Yes, the U.S. Army Corps of Engineers really did stop issuing new private boat dock permits at Lake Texoma — twice. The most recent pause ran from March 5, 2020 to May 1, 2021, while the Corps' Tulsa District rewrote the lake's Shoreline Management Plan (SMP). That moratorium has been lifted, and as of the most recent confirmed information, the Lake Texoma Project Office has been accepting new dock applications on a first-come, first-served basis since May 2021 under the finalized 2021 SMP. Permit rules can change again with little public notice, so anyone counting on building a dock should call the Lake Texoma office directly before assuming a lakefront lot comes with dock rights.

View of Lake Texoma shoreline and water on the Texas-Oklahoma border

What the 2020-2021 Moratorium Actually Was

On March 5, 2020, the Tulsa District announced it would stop reviewing new shoreline management use permits at Lake Texoma so staff could focus on updating the SMP, the governing document for private docks, vegetation modification, and other uses of Corps-managed shoreline. According to the Corps' own release, distributed through the Defense Visual Information Distribution Service (DVIDS), the project office would "not review new boat dock or vegetation modification requests during this time" and would return any new applications with an explanation of why they could not be processed. Existing permit holders were not affected — permit renewals, along with repairs and modifications to already-permitted docks, continued as normal throughout the pause.

Why the Corps Paused Permits — Twice

The Earlier 2009-2014 Moratorium

This was not the first time the Corps hit pause at Lake Texoma. An earlier moratorium ran from May 2009 to July 2014, triggered by major flood damage to lake facilities in 2007, a large backlog of pending applications, and staffing shortages at the project office. When that moratorium lifted, the office worked through years of backlogged applications in the order received before opening the door to brand-new construction requests in coves with available space.

The 2020-2021 Moratorium

The 2020 pause had a narrower, more specific cause: the SMP in place at the time dated back to 1996 and needed to be brought in line with updated federal regulations and the lake's 2017 Master Plan. The Corps opened a formal public comment period on the SMP revision in December 2020, then finalized the new plan in February 2021. With the new rulebook in hand, the Tulsa District announced the moratorium would end and new applications would be accepted again starting May 1, 2021.

What Changed When the Moratorium Lifted

Since May 1, 2021, the Lake Texoma Project Office has processed new shoreline use applications first-come, first-served under the 2021 SMP. Applicants must submit an SWT Form 1133, two sets of structural plans on standard 8.5x11 paper, proof of legal access to the shoreline, a detailed site map showing the proposed dock location, and notarized copies of boat registration. None of this guarantees approval — coves have to have available space and meet the plan's density and environmental criteria — but it confirms the agency is, at least as of the last publicly documented update, open for new business rather than in a blanket freeze.

What This Means for Lake Texoma Buyers Today

For anyone shopping waterfront property around the lake, this history is a real caution flag, not just trivia. A lot that looks perfect for a boat dock is not automatically entitled to one — dock rights ride on Corps permitting, not on the property deed alone, and that permitting has been shut off entirely for years at a stretch, twice, within the last two decades. That matters whether you're looking at a cove in Grayson County, TX, waterfront acreage in Bryan County, OK, or a lot along the Oklahoma shoreline in Marshall County, OK. In every case, the Corps of Engineers — not the county, not the seller, and not the listing agent — controls whether a new dock permit is available on any given stretch of shoreline.

The safest assumption for a buyer is that permit status is a snapshot, not a guarantee. Even during periods when the office is actively accepting applications, individual coves can be full, environmentally sensitive, or otherwise excluded, and the rules themselves get revised periodically as new Shoreline Management Plans are adopted. A property that already has an existing, permitted, transferable dock is a fundamentally different purchase than a lot with "potential" for one.

How to Confirm Current Permit Status Before You Buy

Before writing an offer on any lake lot with dock ambitions, take these steps:

Call the Lake Texoma Project Office directly at 903-465-4990, or visit in person at 351 Corps Rd., Denison, TX 75020, and ask specifically whether new shoreline management use permits are currently being accepted for the cove in question. Ask whether any moratorium, backlog, or cove-specific closure is in effect right now, since that status can change independently of the general SMP. If a property is advertised as having an existing dock, ask the seller for the actual permit number and confirm with the Corps that it is current, in the seller's name, and transferable to a new owner — permits do not always transfer automatically. For a deeper walkthrough of the entire application process, from SWT Form 1133 through final inspection, our guide to the dock permitting process covers what to expect step by step.

None of this should scare a serious buyer away from waterfront property at Lake Texoma — thousands of permitted private docks already dot the shoreline, and the current process has been open for new applications for several years. It simply means dock rights deserve the same due diligence as title work or a survey, verified directly with the federal agency that actually controls the water's edge.

Waterfront Homes for Sale Near Lake Texoma

262 Properties Found
Sort By:

Frequently Asked Questions

Is there currently a moratorium on new boat dock permits at Lake Texoma?

Not based on the most recent publicly documented information. The last known moratorium ran from March 5, 2020 to May 1, 2021, and the U.S. Army Corps of Engineers Tulsa District has been accepting new shoreline management use applications on a first-come, first-served basis since it lifted. Because permit rules and cove-by-cove availability can change, call the Lake Texoma Project Office at 903-465-4990 to confirm current status before assuming a lot qualifies for a new dock.

Why did the Army Corps stop issuing new dock permits at Lake Texoma?

The 2020-2021 pause was implemented so the project office could rewrite the Shoreline Management Plan (SMP), the rulebook governing private docks and shoreline uses. The prior SMP dated to 1996 and needed to be updated to match new federal regulations and the lake's 2017 Master Plan. An earlier moratorium from 2009 to 2014 was caused by flood damage, an application backlog, and staffing shortages.

Did the moratorium affect existing, already-permitted docks?

No. During the 2020-2021 moratorium, the Corps continued to process renewals of existing permits and approve repairs or modifications to already-permitted docks. Only new dock construction applications and vegetation modification requests were paused.

How do I apply for a new dock permit at Lake Texoma now?

Applicants submit SWT Form 1133 along with two sets of structural plans, proof of legal access to the shoreline, a site map showing the proposed dock location, and notarized boat registration copies to the Lake Texoma Project Office. Applications are processed first-come, first-served and are subject to space and environmental limits in the cove. Our guide to the dock permitting process covers each step in more detail.

Does a waterfront lot automatically come with the right to build a dock?

No. Dock rights on Lake Texoma are controlled by U.S. Army Corps of Engineers permits, not by the property deed. A lakefront lot may have no available permit slots, may sit in a cove that is full or restricted, or may be subject to a future moratorium. Always verify permit status and, for existing docks, permit transferability, directly with the Corps before closing.

WRITTEN BY
Brian & Jonelle
Brian & Jonelle
Lake Texoma REALTOR

About Brian & Jonelle

Brian Allen and Jonelle Allen are the Lake Texoma real estate agents behind Love My Texoma Home, serving buyers and sellers across Sherman, Denison, Durant, and the Grayson, Bryan, and Marshall County communities that ring the lake. Brian specializes in foreclosures, probate sales, and renovation properties, while Jonelle focuses on luxury lakefront and waterfront homes.

Together they cover land and ranch, investment property, and everything in between — guided by a mission to bring people together so they can grow, love, and succeed. Have a question about buying or selling on the Texas or Oklahoma side of Texoma?

Call (580) 217-7435.

Chapters
What's your home worth?
Have a top local Realtor give you a FREE Comparative Market Analysis